Operational excellence · manufacturing

Less waste. More throughput. Stable production.

Andrzej Smoleński — production and operations transformation manager. I combine shop-floor experience, Lean Six Sigma, TPM and digitalization so change ends in a business result, not a slide deck.

For boards, business owners, recruiters and manufacturing organizations.

20+ years of operations experience
Andrzej Smoleński, production and operations transformation manager
Operations Transformation LeaderLean · Six Sigma · TPM · Digital
PLN 1.5Mannual Kaizen program impact
6.5 h → 45 minaverage changeover time
150injection molding machines covered
30 millionunits/month with no scrap
80% OEEafter new plant start-up
6 FTEof organizational capacity freed up
Profile

Transformation starts at the process

First a gemba diagnosis, conversations with people and data. Then priorities, standards, accountability and automation. Technology strengthens a good process — it doesn't replace it.

Production and operations transformation manager with more than 20 years of experience in management, team development and process efficiency improvement.

I combine practical operational experience with Lean Manufacturing, Six Sigma, TPM and process digitalization. I focus on productivity growth, quality improvement, cost reduction and production stability.

Learn about my approach →

Method

From observation to a lasting result

No implementation theater. Every stage has a clear goal, owner, metric and link to the organization's result.

01 · GEMBA

A day in the life

Observing the process with the operator, conversation, data and identifying real losses.

→
02 · PRIORITY

Pareto of problems

Choosing the barriers with the strongest impact on throughput, quality and the team's work.

→
03 · SYSTEM

PDCA and standard

Solving the problem, standardization, competence development and daily process control.

→
04 · SCALE

Data and automation

Once habits are stable: digitalizing measurement, automating reporting and scaling.

✓
Areas of activity

Support for organizations that need results

Scope tailored to the business problem — from diagnosis and an improvement project to taking ownership of the transformation.

↗

Operations transformation

Strategy, management system, KPIs, accountability and implementing cross-functional change.

Scope of work →
⚙

Production and flow

OEE, line balancing, layout, quality, on-time delivery, throughput and plan stability.

Scope of work →
Σ

Lean Six Sigma, TPM and SMED

Tools used as a means to reduce losses and build organizational capability.

Scope of work →
01

Process digitalization

Reporting automation, production data, ERP/MES and fact-based decisions.

Scope of work →
Proof of work

Anonymous case studies

I don't publish organization names without their consent. I show the problem, the approach and the result — specifically enough to assess the scale of the experience.

medical device manufacturing
6.5 h → 45 min

Changeovers on 150 injection molding machines

A program based on SMED, work standards and team competence development.

150 machinesSMEDcapacity without CAPEX
Read the case study →
serial manufacturing
PLN 1.2M

Annual operational savings

Production reorganization, better resource utilization and loss-reduction projects.

productivityqualitycost
Read the case study →
technical materials
−30%

Unplanned downtime

A TPM program combined with quality improvement and reduced tool failure rates.

TPM+15% qualityapprox. PLN 800K
Read the case study →
Knowledge Hub

Practice instead of a tool catalog

Content for managers, leaders and teams who want to solve problems, not just implement trendy labels.

OEE Without a Million-Dollar Budget

Excel, a standard cycle time and correlating settings with quality get you there — but OEE never replaces gemba.

Read the article →

An Operator Leaving vs. a Manager Leaving

We call a manager's growth ambition, a good operator's departure sometimes a lack of loyalty. The same need, two different labels.

Read →

The Define Phase

"Let's get OEE to 85%" is an expectation, not a problem. A well-run Define phase turns it into a defined problem, scope and goal.

Read →
Next step

Do you have a process that isn't delivering results?

30 minutes is enough to determine whether the problem needs a quick diagnosis, an improvement project or a broader transformation.

Coverage areaPoland · national projects